Maksim Golub / Analytics Playbook
Metrics tree ↗

Case 09. Productivity

Lithograph: three craftspeople at different workstations

The question

There are three persons - A, B and C with different efficiency to produce three items. They can work for 12 hours a day. The following table gives the time taken (in minutes) by each person to complete each of the items.

What is the maximum number of items that can be produced in a day?

Input data

Person APerson BPerson C
Item 1121516
Item 218915
Item 3101812

How to read the data

Cells contain minutes per completed item. A smaller number means faster production. Columns identify workers, so find the fastest item within each column.

How to think it through

  1. Convert 12 hours to 720 minutes for each worker.
  2. Identify the objective: maximise the total count with no required product mix.
  3. Choose the minimum time in each column. Compute each worker’s output and sum the results.
Choose an answer
How to solve it
  1. Convert the workday: 12 × 60 = 720 minutes per person.
  2. Choose the shortest time in each person's column: A needs 10, B needs 9 and C needs 12 minutes.
  3. Output is 72 + 80 + 60 = 212 units. The question imposes no product-mix quotas.
720 ÷ 10 + 720 ÷ 9 + 720 ÷ 12 = 212

212 units

Without product quotas, each person makes the item they can produce fastest.

Assumptions & further exploration

Assume independent work, constant speeds and no setup time or downtime. For a fractional result, round down completed items separately for each worker. Product quotas require a separate time-allocation problem.